Reduced and amended Thameslink service to / from / via London Bridge on Sunday 15 November
Engineering work details
Starts Sunday 15 November 2026 to Sunday 15 November 2026
Train operators affected
Route(s) affected
All Thameslink services to / from / via London Bridge
Description
Engineering work is taking place in the London Bridge area, closing many of the lines use by Thameslink.
As a result, most Thameslink trains will be diverted and will not call at London Bridge.
Thameslink trains to / from Rainham (Kent) will only run between Plumstead and Rainham (Kent). Your tickets will be accepted at no extra cost on Southeastern services between London and Plumstead.
All other Thameslink trains which usually run via London Bridge will be diverted between London Blackfriars and East Croydon, not call at London Bridge, and run to a revised timetable with extended journey times.
Paper rail tickets will be accepted at no extra cost on:
London Underground services between Blackfriars and London Bridge / Cannon Street
Elizabeth line trains between Farringdon and Abbey Wood
London Buses between Kings Cross St Pancras and London Bridge
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner.
You can plan your journey on London Underground / London Buses by using the Transport for London Journey Planner.
Advertisement
Advertisement