Amended early morning Thameslink services to / from Sutton on Sunday 16 November
Engineering work details
Starts Sunday 16 November 2025 to Sunday 16 November 2025
Train operators affected
Route(s) affected
Thameslink between London Bridge and Sutton
Description
Engineering work is taking place between London Bridge and Sutton, closing some lines.
As a result, the following trains will be amended to start from London Blackfriars instead of London Bridge, departing at the same times:
The 08:30 London Bridge to Sutton
The 09:00 London Bridge to Sutton
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
Advertisement