Buses replace trains between Three Bridges and Horsham / Pulborough on Sunday 10 November
Engineering work details
Starts Sunday 10 November 2024 to Sunday 10 November 2024
Train operators affected
Route(s) affected
Southern between London Victoria and Horsham / Bognor Regis / Portsmouth Harbour, and between Three Bridges and Horsham
Thameslink between Bedford / London Bridge and Horsham
Description
Engineering work is taking place between Three Bridges and Horsham, closing all lines.
Southern:
All day on Sunday, buses will replace trains between Three Bridges and Horsham / Pulborough.
Trains between Pulborough and Bognor Regis will run a reduced service, and trains between London Victoria and Littlehampton will run to an amended timetable stopping additionally at Three Bridges.
Trains between Bognor Regis and Pulborough will start / terminate on Platform 1 at Pulborough. This platform does not have step free access. If you are travelling to / from Pulborough and require step free access, please speak to station or onboard staff for further assistance. If you are travelling to / from London and require step free access, you should travel via Hove.
Thameslink:
Thameslink trains between Bedford and Three Bridges / Horsham will be amended to run between Bedford and Gatwick Airport.
You can use your ticket on alternative trains between Gatwick Airport and Three Bridges, and on Southern services between Three Bridges and Horsham.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
Replacement Bus Travel Advice:
For helpful advice if you need to travel on a rail replacement service, including accessibility information, please use our travel information pages.
You can find the location of your replacement bus by checking station signs or by searching for your station on our station information pages.
Please be advised that replacement vehicles may be busier than usual, and you should allow extra time for your journey.
Advertisement