Future engineering work

PAGE LAST UPDATED: 23/07/2019 19:05. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended Thameslink service between Bedford / Cambridge and Brighton on Sunday 18 August

Start date
18/08/2019  00:00
End date
18/08/2019 
Route affected
Download map of route afected

Between Bedford / Cambridge and Brighton

 
TOC(s) affected
Thameslink
Description

Engineering work is taking place between Bedford and London St Pancras International and between London Bridge and East Croydon, closing various lines.

Until approximately 09:00, a reduced service will operate between Bedford and London St Pancras International.

From approximately 09:00, a revised and reduced timetable will operate between Bedford and East Croydon / Three Bridges with services departing up to 15 minutes earlier than normal.

A reduced service will also operate between Luton and London Blackfriars.

All day, Thameslink services between Bedford and Brighton / Three Bridges and between Cambridge and Three Bridges will be diverted and unable to call at London Bridge.

Journey times between London Blackfriars and East Croydon will be extended by up to 20 minutes.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner