Future engineering work

PAGE LAST UPDATED: 19/09/2019 01:39. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended service between Doncaster and Peterborough from Saturday 9 until 12:00 on Sunday 10 November

Start date
09/11/2019  00:00
End date
10/11/2019 
Route affected
Download map of route afected

Grand Central between Bradford Interchange and London Kings Cross

Hull Trains between Hull and London Kings Cross

LNER between Aberdeen / Edinburgh / Newcastle / Leeds and London Kings Cross

 
TOC(s) affected
Grand CentralHull TrainsLNER
Description

Engineering work is taking place between Doncaster and Peterborough from 01:30 on Saturday until 12:00 on Sunday, closing all lines via Grantham.

Grand Central

All day Saturday and until 12:00 on Sunday, trains will operate to an amended timetable and will be diverted via Lincoln extending journey times.

Hull Trains

All trains will be diverted via Lincoln extending journey times.

LNER

It is not yet known how LNER services will be affected by this engineering work.

Check before you travel:

If you are travelling with Grand Central or Hull Trains, please use the National Rail Enquiries Journey Planner