Future engineering work

PAGE LAST UPDATED: 20/09/2019 08:58. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended Valley Line services on Saturday 23 and Sunday 24 November

Start date
23/11/2019  00:00
End date
24/11/2019 
Route affected
Download map of route afected

All Valley Line routes through Cardiff Central

 
TOC(s) affected
Transport for Wales
Description

Engineering work is taking place in the Cardiff Central area, closing some lines.

As a result of this, passengers wishing to travel between Valley Line stations and Barry / Penarth will be required to change to a different train at Cardiff Central on to their destination.

The following alterations will also apply:

  • All Rhymney to Cardiff Bay services will start / terminate at Heath High Level.
  • Additional rail replacement bus services will operate between Cardiff Central and Radyr throughout the day.
  • Additional rail replacement bus services will also operate between Cardiff Central and Caerphilly.
  • A rail replacement bus service will operate instead of the 23:16 service between Cardiff Central and Ystrad Mynach.

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.

Replacement Bus Travel Advice:

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages.

Bicycles are not allowed on rail replacement bus services at any time, unless fully folded. More travel advice for your replacement bus journey is available by selecting the Train Operating Company you are travelling with here.