Future engineering work

PAGE LAST UPDATED: 23/01/2020 11:10. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended service to / from London Kings Cross on Saturday 15 and Sunday 16 February

Start date
15/02/2020  00:00
End date
16/02/2020 
Route affected
Download map of route afected

Grand Central between London Kings Cross and Bradford Interchange / Sunderland

Great Northern between London Kings Cross / Moorgate and Hertford North / Welwyn Garden City / Stevenage / Peterborough / Cambridge / Cambridge North / Kings Lynn

Hull Trains between London Kings Cross and Hull / Beverley

LNER between London Kings Cross and Leeds / York / Newcastle / Edinburgh / Glasgow Central / Aberdeen / Inverness

Thameslink between London Kings Cross and Peterborough / Cambridge

 
TOC(s) affected
Grand CentralGreat NorthernHull TrainsLNERThameslink
Description

Engineering work is taking place in the Kings Cross area, closing some lines to / from the station.

Grand Central:

A reduced and retimed service will run, with some trains to / from Bradford Interchange / Sunderland not running.

Great Northern:

An amended and reduced service will operate between London Kings Cross and Cambridge / Peterborough.

Hull Trains:

An amended and retimed service will be in operation, with some trains being retimed by a few minutes.

LNER:

A reduced service of four trains per hour (in each direction) will run to / from London Kings Cross. Other trains will be amended to terminate / start from Peterborough / Doncaster.

Train services running to / from London Kings Cross will be expected to be busy.

Thameslink:

An amended and reduced service will operate between London Kings Cross and Cambridge / Peterborough.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner