Future engineering work

PAGE LAST UPDATED: 13/12/2019 11:53. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

No trains to / from London Charing Cross / Waterloo East on Sunday 23 February

Start date
23/02/2020  00:00
End date
23/02/2020 
Route affected
Download map of route afected

All Southeastern routes to / from London Charing Cross / Waterloo East

 
TOC(s) affected
Southeastern
Description

Engineering work is taking place between New Cross and London Charing Cross, closing all lines.

No trains will run to / from London Charing Cross or Waterloo East all day.

The following train services will be amended to run to / from London Cannon Street:

  • London Charing Cross and Ramsgate (via Paddock Wood). These services will also be affected by engineering work in the Ashford International area.
  • London Charing Cross and Dover (via Paddock Wood).
  • London Charing Cross and Hastings.
  • London Charing Cross and Dartford (via Woolwich).
  • London Charing Cross and Sevenoaks (via Grove Park).
  • London Charing Cross and Gravesend (via Sidcup). These services will additionally call at New Cross and St Johns.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner