Future engineering work

PAGE LAST UPDATED: 23/01/2020 07:32. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Buses replace trains between Three Bridges and Horsham on Saturday 22 and Sunday 23 February

Start date
22/02/2020  00:00
End date
23/02/2020 
Route affected
Download map of route afected

Southern between London Victoria / Gatwick Airport / Three Bridges and Horsham / Bognor Regis / Portsmouth Harbour / Southampton Central

Thameslink between Peterborough / London Bridge and Horsham

 
TOC(s) affected
SouthernThameslink
Description

Engineering work is taking place between Three Bridges and Horsham.

As a result, buses will replace trains between Three Bridges and Horsham.

On Saturday, services that run between London Victoria and Bognor Regis / Portsmouth Harbour / Southampton Central will run as separate trains between Southampton Central / Portsmouth Harbour / Bognor Regis and Horsham. These trains will run together as a single train between London Victoria and Horsham.

On Sunday, services that run between London Victoria and Portsmouth Harbour will run between Horsham and Barnham. At Barnham, two separate services will run between Barnham and Bognor Regis, and Barnham and Portsmouth Harbour.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

Replacement Bus Travel Advice:

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages.

Bicycles are not allowed on rail replacement bus services at any time, unless fully folded. More travel advice for your replacement bus journey is available by selecting the Train Operating Company you are travelling with here.