Future engineering work

PAGE LAST UPDATED: 31/05/2020 12:19. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended Great Western Railway service between Cardiff Central and Newport on Sunday 2 August

Start date
02/08/2020  00:00
End date
02/08/2020 
Route affected
Download map of route afected

Between Swansea / Carmarthen / Cardiff Central and Brighton / Bristol Temple Meads / London Paddington / Taunton / Portsmouth Harbour

 
TOC(s) affected
Great Western Railway
Description

Engineering work is taking place between Cardiff Central and Newport, closing some lines.

As a result of this, the following alterations will apply:

  • Between 10:20 and 20:30, trains between Cardiff Central and Portsmouth Barbour / Brighton will be retimed to depart up to 5 minutes earlier than usual.
  • Some services between London Paddington and Swansea / Carmarthen will depart Cardiff Central and beyond a few minutes later than normal
  • Between 09:22 and 19:22, trains between Swansea and London Paddington (in both directions) will depart up to 5 minutes earlier than normal. Once at Newport, trains will run as timetabled.

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.