Future engineering work

PAGE LAST UPDATED: 31/05/2020 12:21. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Reduced Thameslink service at London Bridge on Sunday 26 July

Start date
26/07/2020  00:00
End date
26/07/2020 
Route affected
Download map of route afected

Thameslink services via London Bridge

 
TOC(s) affected
Thameslink
Description

Engineering work is taking place between London Blackfriars and London Bridge, closing all lines.

No through Thameslink train services will call at London Bridge. Thameslink trains that start and finish at London Bridge will still run.

Train services between Bedford / Cambridge and Gatwick Airport / Brighton, and also between London Bridge and Horsham will run to an amended timetable.

Trains that usually run between Kentish Town and Rainham will be amended to run between Dartford and Rainham only. Customers should use alternative Southeastern services between London Charing Cross / London Cannon Street and Dartford.

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.