Future engineering work

PAGE LAST UPDATED: 16/10/2021 03:42. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Buses replace trains between Wimbledon and Dorking / Chessington on Sunday 14 November

Start date
14/11/2021 
End date
14/11/2021 
Route affected

Between London Waterloo and Chessington South / Dorking / Guildford

 
TOC(s) affected
South Western Railway
Description

Engineering work is taking place between Raynes Park and Leatherhead, resulting in the closure of some lines.

The 32 minutes past London Waterloo to Guildford service will start from Leatherhead.

The 10 and 40 minutes past the hour London Waterloo to Guildford services will depart at 12 and 42 minutes past, calling additionally at Raynes Park.

The 6 minutes past the hour London Waterloo to Guildford service will depart at 2 minutes past the hour, calling additionally at Raynes Park.

The 20 minutes past the hour Guildford to London Waterloo service will terminate at Leatherhead.

The 24 / 50 / 57 minutes past the hour Guildford to London Waterloo services will call additionally at Raynes Park.

Rail replacement buses will run between:

  • Wimbledon and Chessington.
  • Wimbledon and Dorking.
  • Wimbledon and Leatherhead.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

Although journey planners are showing correctly, your journey may be subject to alteration at short notice due to the Coronavirus outbreak. Please check before your journey.

Replacement Bus Travel Advice:

For helpful advice if you need to travel on a rail replacement service, including accessibility and bicycle information, please use this page.

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages.