Amended Grand Central services to / from Bradford Interchange on Saturday 30 and Sunday 31 May
Engineering work details
Starts Saturday 30 May 2026 to Sunday 31 May 2026
Train operators affected
Route(s) affected
Between Halifax / Bradford Interchange and London Kings Cross
Description
Engineering work is taking place between Brighouse and Wakefield Kirkgate, closing some lines.
All services will be diverted to run via Bramley, not calling at Low Moor, Brighouse and Mirfield.
Some services will run between Halifax and London Kings Cross.
Rail replacement buses will operate between Brighouse and Wakefield Kirkgate, calling at Mirfield. Some services will be extended to run to / from Halifax.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
Replacement bus travel advice:
For helpful advice if you need to travel on a rail replacement service, including accessibility and bicycle information, please use our Rail Replacement Services page.
You can find the pick-up and set-down location of rail replacement services by checking station signage or by searching for your station on our Find a Station page.
Please be advised that replacement vehicles may be busier than usual, and you should allow extra time for your journey.
Advertisement
Advertisement