Amended services to / from / via London Paddington on Sunday 14 September
Engineering work details
Starts Sunday 14 September 2025 to Sunday 14 September 2025
Train operators affected
Route(s) affected
Elizabeth line between Abbey Wood and Heathrow Terminal 4 / Maidenhead / Reading, between Shenfield and Heathrow Terminal 4, and between London Paddington and Hayes & Harlington / Heathrow Terminal 4 / Maidenhead / Reading
All Great Western Railway services to / from London Paddington
Heathrow Express between London Paddington and Heathrow Terminal 5
Description
Engineering work is taking place between London Paddington and Hayes & Harlington, closing some lines.
Elizabeth line:
Trains that usually run between Abbey Wood and Maidenhead will run between Abbey Wood and London Paddington (Elizabeth line platforms) only.
The following stations will have a reduced service of 2 trains per hour:
Maidenhead
Burnham
Slough
Langley
West Drayton
Heathrow Terminal 4
The following stations will have a reduced service of 6 trains per hour:
Hayes & Harlington
Southall
Ealing Broadway
The following stations will have no train service:
Acton Main Line
Hanwell
West Ealing
For these stations, you should instead use London Underground services from nearby London Underground stations.
Great Western Railway:
Long distance services:
An amended and slightly reduced service will run, with long distance services to / from London Paddington will be retimed to depart up to 8 minutes earlier than usual and arrive a few minutes later than normal.
Local services:
Most trains between London Paddington and Didcot Parkway terminate / start from Reading.
Heathrow Express:
An amended Heathrow Express service will be in place between London Paddington and Heathrow Terminal 5. The following timetable will be in place:
From London Paddington to Heathrow Terminal 5:
A normal service every 15 minutes until 09:55
Then at 10:25 and every 30 minutes until 22:55
Then at 23:10 and last train at 23:25
(An additional shuttle service will run at 22:57 from Heathrow Terminals 2 & 3 to Heathrow Terminal 5)
From Heathrow Terminal 5 to London Paddington:
A normal service every 15 minutes until 08:57, also at 09:15, 09:27 and 09:44
Then at 10:01 and every 30 minutes until 22:31
Then at 22:57, 23:12, 23:27, 23:42 and last train at 23:57
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner