CANCELLED: late night / early morning engineering work at Exeter St Davids from Monday 21 to Thursday 24 September
Engineering work details
Starts Monday 21 September 2026 to Thursday 24 September 2026
Train operators affected
Route(s) affected
Great Western Railway between London Paddington and Penzance, and between Bristol Temple Meads and Exeter St Davids
Description
Engineering work scheduled to take place between Exeter St Davids and Exeter St Thomas has been cancelled, and will not take place.
The following trains will run as normal:
The 23:45 (Monday to Wednesday) London Paddington to Penzance "Night Riviera" Sleeper service
The 23:48 (Monday and Tuesday) Bristol Temple Meads to Exeter St Davids service
Check before you travel:
The Journey Planner has not yet been amended to reflect the cancellation of the engineering work. Please check back nearer the time of travel.
Advertisement
Advertisement