Amended services to / from London Paddington on Sunday 26 January
Engineering work details
Starts Sunday 26 January 2025 to Sunday 26 January 2025
Train operators affected
Route(s) affected
All Elizabeth line services to / from / via London Paddington
All Great Western Railway services to / from London Paddington
All Heathrow Express services to / from London Paddington
Description
Engineering work is taking place between London Paddington and Ealing Broadway, closing all lines early in the morning, and some lines all day.
Elizabeth line:
Before 07:40:
No trains will operate between Ealing Broadway and London Paddington.
After 07:40:
Services between Abbey Wood and Maidenhead will run between Abbey Wood and London Paddington only
Services between Abbey Wood and Heathrow Terminal 4 will run to a reduced timetable of 2 trains per hour
Maidenhead, Burnham, Slough, Langley and West Drayton will have a reduced service of 2 trains per hour
Hayes & Harlington, Southall and Ealing Broadway will have a reduced service of 6 trains per hour
Heathrow Terminals 2 & 3 will have a reduced service of 4 trains per hour
Acton Main Line, Hanwell and West Ealing will have no trains
Trains between Abbey Wood and Reading will now call at Iver
Great Western Railway:
Long distance services:
Most long distance trains will be retimed to run up to 6 minutes earlier or later than normal.
Local services:
The 06:20 Reading to London Paddington service will be amended to start at 06:36 and run later than usual throughout.
The 06:38 London Paddington to Didcot Parkway service will not run. You can use later Elizabeth line / Great Western Railway trains to complete your journey.
Heathrow Express:
No trains will run before 07:20.
After 07:20, trains will run to an amended timetable until the end of the day.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
You can plan your journey on London Underground by using the Transport for London Journey Planner
Advertisement