Amended services to / from London Paddington on Sunday 23 February
Engineering work details
Starts Sunday 23 February 2025 to Sunday 23 February 2025
Train operators affected
Route(s) affected
All Elizabeth line services to / from / via London Paddington
All Great Western Railway services to / from London Paddington
All Heathrow Express services to / from London Paddington
Description
Engineering work is taking place between London Paddington and Ealing Broadway, closing some lines.
Elizabeth line:
The 00:07 Heathrow Terminal 5 to London Paddington service will start at 00:12, and will terminate at Ealing Broadway.
Sunday until 07:40:
No trains will run between Ealing Broadway and London Paddington.
From 07:40:
Trains that normally run between Abbey Wood and Maidenhead will run between Abbey Wood and London Paddington (Elizabeth line).
Trains between Abbey Wood and Heathrow Terminal 4 will run to a reduced timetable of 2 trains per hour.
As a result:
Maidenhead, Burnham, Slough, Langley and West Drayton will have a reduced timetable of 2 trains per hour
Hayes & Harlington, Southall and Ealing Broadway will have a reduced timetable of 6 trains per hour
No trains will call at Acton Main Line, West Ealing or Hanwell.
Trains to / from Reading will be amended to call additionally at Iver.
Great Western Railway:
Long distance services:
Trains to / from London Paddington will run to an amended timetable, and will run up to 8 minutes earlier or later than usual.
Local services:
The 06:38 London Paddington to Didcot Parkway service will start from Ealing Broadway. London Underground connections are available from central London to Ealing Broadway.
The 06:20 Reading to London Paddington service will depart at 06:36 and operate later throughout.
Trains that usually run between London Paddington and Didcot Parkway will run between Reading and Didcot Parkway through most of the day. Some long distance services will additionally call at Slough, Maidenhead and Twyford.
Heathrow Express:
No trains will run before 07:20.
After 09:20, an amended service will run to a reduced frequency, with trains running every 30 minutes.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
You can plan your journey on London Underground by using the Transport for London Journey Planner
Advertisement