Amended late night / early morning Great Western Railway services to / from Swansea from Monday 2 to Thursday 5 March
Engineering work details
Starts Monday 02 March 2026 to Thursday 05 March 2026
Train operators affected
Route(s) affected
Between London Paddington and Swansea
Description
Engineering work is taking place between Bridgend and Port Talbot Parkway, closing some lines.
Monday to Thursday:
The 20:48 London Paddington to Swansea will divert between Cardiff Central and Bridgend (via Ninian Park – not calling) arriving / departing Bridgend and beyond later than normal.
The 21:48 London Paddington to Swansea will use this route as normal between Cardiff Central and Bridgend
(via Ninian Park – not calling).
The 22:49 London Paddington to Swansea will be diverted between Swindon and Bristol Parkway, calling additionally at Chippenham and Bath Spa (drop off only) and will further divert between Cardiff Central and Bridgend (via Ninian Park – not calling) arriving / departing Bridgend and beyond later than normal.
On Wednesday and Thursday nights the above trains will incur 8 minutes additional journey time between Bridgend and Port Talbot Parkway.
Tuesday and Wednesday:
The 03:46 Swansea to London Paddington will arrive / depart Bridgend and arrive Cardiff Central a few minutes later than normal. Normal timings departing Cardiff Central and beyond.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
Advertisement