Future engineering work

PAGE LAST UPDATED: 20/09/2019 09:25. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

No trains via Grantham from 13:00 on Saturday 23 until 12:00 on Sunday 24 November

Start date
23/11/2019  00:00
End date
24/11/2019 
Route affected
Download map of route afected

Grand Central between Sunderland / Bradford International and London Kings Cross

Hull Trains between Hull and London Kings Cross

LNER between Aberdeen / Inverness / Edinburgh / Newcastle / York and London Kings Cross

 
TOC(s) affected
Grand CentralHull TrainsLNER
Description

Engineering work is taking place between Doncaster and Peterborough, closing all lines from 13:00 on Saturday until 12:00 on Sunday.

Grand Central:

An reduced timetable will be in operation, with trains either diverting to run via Lincoln or not run at all. Journey times will be extended by around an hour, and trains will be retimed to run earlier or later than usual.

Hull Trains:

An amended timetable will be in operation, with trains running via Lincoln. Journey times will be extended by around an hour, and trains will be retimed to run earlier or later than usual.

LNER:

It is not yet known how LNER will be affected by this engineering work.

Check before you travel:

If you are travelling with Grand Central, you can plan your journey using the National Rail Enquiries Journey Planner

If you are travelling with Hull Trains, these changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.