No trains to / from London Kings Cross on Sunday 15 March
Engineering work details
Starts Sunday 15 March 2026 to Sunday 15 March 2026
Train operators affected
Route(s) affected
All routes to / from London Kings Cross
Description
Engineering work is taking place in the London Kings Cross area, closing all lines.
Grand Central:
No trains between London Kings Cross and Bradford Interchange / Sunderland will run.
Great Northern:
It is not yet confirmed how Great Northern will be affected by these works.
Hull Trains:
Hull Trains will operate an amended and reduced service, diverting to run to / from London St Pancras International.
As a result, services will not call at Stevenage, Grantham, Retford, Doncaster, Cottingham and Beverley.
LNER:
No trains will run between London Kings Cross and Peterborough.
Rail replacement buses will operate between Bedford and Peterborough for alternative train services to / from London St Pancras International.
Lumo:
An amended and reduced service will run between Newcastle and Edinburgh / Glasgow Queen Street only.
Thameslink:
It is not yet confirmed how Thameslink will be affected by these works.
Check before you travel:
If you are travelling with Grand Central, Hull Trains or Lumo, you can plan your journey using the National Rail Enquiries Journey Planner
If you are travelling with Great Northern, LNER or Thameslink, these changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.
Replacement bus travel advice:
For helpful advice if you need to travel on a rail replacement service, including accessibility and bicycle information, please use our Rail Replacement Services page.
You can find the pick-up and set-down location of rail replacement services by checking station signage or by searching for your station on our Find a Station page.
Please be advised that replacement vehicles may be busier than usual, and you should allow extra time for your journey.
Advertisement