Lines reopened: delays at Ely
Service alteration details
Incident reported: 22 Apr 2025 at 19:13
Incident cleared: 22 Apr 2025 at 23:26
If you would like to follow this incident on X, please useEly
Last updated
22 Apr 2025 at 23:26
Train operators affected
Route(s) affected
East Midlands Railway between Norwich and Nottingham / Liverpool Lime Street
CrossCountry between Cambridge and Stansted Airport / Birmingham New Street
Greater Anglia between Colchester / Ipswich and Peterborough, between Norwich and Cambridge / Stansted Airport, and also between Ely and London Liverpool Street
Description
Disruption caused by a failure of the overhead electric wires in the Ely area has now ended.