Incident resolved at Peterborough
Service alteration details
Incident reported: 16 Jan 2025 at 09:38
Incident cleared: 16 Jan 2025 at 12:06
If you would like to follow this incident on X, please usePeterborough
Last updated
16 Jan 2025 at 12:06
Train operators affected
Route(s) affected
CrossCountry between Birmingham New Street and Cambridge / Stansted Airport, and also between Bristol Temple Meads and Stansted Airport
East Midlands Railway between Liverpool Lime Street / Warrington Central / Sheffield and Norwich, and also between Doncaster / Lincoln and Peterborough
Grand Central between Sunderland / Bradford Interchange and London Kings Cross
Greater Anglia between Peterborough and Ipswich
Hull Trains between Beverley / Hull and London Kings Cross
LNER between Edinburgh / York / Leeds / Lincoln and London Kings Cross
Lumo between Edinburgh and London Kings Cross
Description
Disruption caused by an earlier fault with the signalling system at Peterborough has now ended.